Skip to main content
City of Bethlehem Home
Complete Streets

Complete Streets

The City of Bethlehem envisions a future where streets are designed for people, not just for cars. To make this vision a reality, the City is creating a Complete Streets Plan to make our roads safer, more comfortable, and more accessible for everyone, whether you walk, bike, take transit, or drive.

Phases

Phases overview
Phase 2: Initial Strategies and Concepts
Initial Strategies and Concepts
Phase 3: Stefko Boulevard and Draft Plan
Stefko Boulevard and Draft Plan

Stefko Boulevard and Draft Plan

July 6, 2026 4:00 AM - August 7, 2026 3:59 AM

Welcome to the Bethlehem Complete Streets Plan!

What are Complete Streets and why are they important?

Complete Streets are designed to enable safe mobility and access for all users, including pedestrians, bicyclists, motorists, and transit riders of all ages and abilities.

The City of Bethlehem is creating a community-driven plan to advance the City’s streets and trails to:

As part of the planning process, we will:

How does this relate to the project along Broad Street?

As a major downtown commercial street that serves people taking all forms of transportation, Broad Street is a great example of a Complete Streets project that will incorporate separated bike lanes, curb extensions, bus stops, and medians. The Complete Streets Plan and the Broad Street project are designed to work hand in hand, ensuring that the improvements along Broad Street align with the citywide vision and design principles being developed through the plan.

Stefko Boulevard Improvement Project

The City of Bethlehem envisions a future where streets are designed for people, not just cars. Stefko Boulevard was identified as a corridor of need through various internal and external engagement efforts, including the Bethlehem Area School District, Pembroke neighborhood, and the Bethlehem community at large. Stefko offers regional connectivity to key destinations, has seen a large number of severe crashes, is on the bike and bus network, and is due for resurfacing.

Don't let this opportunity pass by, SHARE YOUR FEEDBACK HERE: https://www.surveymonkey.com/r/StefkoBlvdImprovementProject

Want to Get Involved?

Subscribe to this project on We Build Bethlehem for upcoming announcements and take the Stefko Boulevard Survey!

6/18 Public Open House PowerPoint:

Upcoming and ongoing events

    0 events have loaded.
    No upcoming or ongoing events are currently scheduled.

    Past events

    6 events have loaded.