Dutko Park
Dutko Park is the second park upgraded through the City’s 40-in-10: Every Park in Ten Years Parks and Recreation Master Plan. Dutko Park is considered a Community park, which typically comprise less than 2.5 acres each and serve residents within walking distance, ranging from small pocket parks to civic spaces focused on gathering or reflection. The upgrades were done through a resident-driven makeover as part of the Pembroke Choice Neighborhoods grant.
A celebration and ribbon-cutting on August 19th, 2026 was hosted by the City of Bethlehem and Bethlehem Housing Authority, which marked the completion of a $500,000 federal Choice Neighborhoods Planning grant.
Early in the two-year Choice planning process, the safety of Stefko Boulevard and Pembroke Road quickly rose as community concerns. Eventually upgrades to the street crossings and parks were identified as top resident priorities for the Early Action project.
During the school year, hundreds of children traverse the triangle-shaped park – located between Stefko Boulevard, Pembroke Road and Washington Avenue – enroute to neighboring schools and it sits along one of LANTA’s rapid transit bus routes.
To improve pedestrian safety, the traffic signals at the intersections of Stefko and Pembroke were upgraded to ones with pedestrian hand signals and countdowns. Repainting of crosswalks surrounding the park will be completed prior to the start of the 2026-2027 school year.
Working in partnership with LANTA, the three bus stops surrounding the park have been upgraded to include two new bus shelters on Stefko and a bench on Pembroke, offering better rider shelter and protection from Stefko traffic. The Washington Ave Enhanced Bus Service (EBS) stops on Stefko are high ridership and growing in popularity, but the existing conditions were not ideal for access and passengers waiting. The new bus shelters and pedestrian access to the northbound bus stop, in particular, will significantly benefit transit riders and improve the pedestrian experience at this important gateway to the neighborhood.
Within the park itself, new walking pathways were added along with installation of seating, game-playing tables and climbing equipment. The project was funded by $150,000 in Choice Early Action Funding and $110,000 in City recreation funding approved by Bethlehem City Council in April 2025.
Improvements include:
Playful Places
- Inclusive play
Gathering Spaces
- Chess tables
Overall Considerations
- Benches
- Trash receptacles







Check back here for engagement opportunities and updates!

